D
IRECTION 5813707-100, REVISION 2 VENUE GO™ SERVICE MANUAL
4-10 Chapter 4 - General Procedures and Functional Checks
PRELIMINARY
4-3-2 Safety Checks
4-3-2-1 Ground Continuity Check
1) Use an Ohmmeter/multimeter to measure the ground resistance between the Split cable GND pin
and the cart GND pin.
2) Verify the measured value is less than 0.1 [Ohm].
4-3-3 Phantoms Performance Checks
The use of test phantoms is only recommended if required by your facility's (customer’s) QA program.
Figure 4-48 GND Continuity Test