9
Table 7 Mounting positions for the A5800AF-48G/A5820AF-24XG
Mounting bracket
position
Installing the
mounting brackets
Installing the chassis
rails and slide rails
Rear mounting
(near the power
supplies)
Front mounting
(near the
network ports)
See ―Attaching the
mounting brackets and
chassis rails to the
chassis.‖
Required.
See ―Attaching the
mounting brackets and
chassis rails to the
chassis‖ and Attaching the
slide rails to the rack.
See ―Mounting the switch in
the rack.‖
IMPORTANT:
The depth of the rack for the A5800AF-48G and A5820AF-24XG switches must be 1000 mm (39.37
in).
Table 8 Mounting positions for all the other A5800/A5820X switches
Mounting bracket
position
Installing the
mounting brackets
Installing the chassis
rails and slide rails
Rear mounting
(near the power
supplies)
Front mounting
(near the
network ports)
Mid-mounting
See ―Attaching the
mounting brackets to
the chassis (for all the
switches except the
A5800AF-
48G/A5820AF-
24XG).‖
See ―Rack-mounting an
A5800/A5820X switch
except the A5800AF-
48G/A5820AF-24XG.‖
Attaching the mounting brackets, chassis rails, and grounding
cable (A5800AF-48G/A5820AF-24XG)
The A5800AF-48G and A5820AF-24XG switches have one front mounting position (near the network
ports) and one rear mounting position (near the power supplies). The switches also have one primary
grounding point (with a grounding sign) and two auxiliary grounding points. In most cases, you use the
primary grounding point. If the primary grounding point fails or is not suitable for the installation site, use
one of the auxiliary grounding points.