c. Power on the system.
Does the system power on?
No The last card that was installed in step 4 on page 105 of this procedure is
failing, replace the failing card.
This ends the procedure. Go to ″Map 0410: Repair Checkout″ in the
Diagnostic Information for Multiple Bus Systems.
Yes Go to step 5.
5. Have all the Mxx load cards been installed?
No Repeat step 4 on page 105.
Yes This ends the procedure.
6. Is SRC 1xxx1202 displayed?
No Go to step 10.
Yes Go to step 7.
7. Perform the following:
a. Power off the system.
b. Remove the load cards M05, M06, M16, M18, and M19.
c. Power on the system.
Does the system power on?
No Go to step 23 on page 108.
Yes Go to step 8.
8. Perform the following:
a. Power off the system.
b. Install one of the Mxx load cards that was removed in step 7.
c. Power on the system.
Does the system power on?
No The last card that was installed in step 8 is failing, replace the failing card.
This ends the procedure. Go to ″Map 0410: Repair Checkout″ in the
Diagnostic Information for Multiple Bus Systems.
Yes Go to step 9.
9. Have all the Mxx load cards been installed?
No Repeat step 8.
Yes This ends the procedure.
10. Is the SRC 1xxx1203?
No Go to step 13 on page 107.
Yes Go to step 11.
11. Perform steps 23 on page 108 through 25 on page 109 and then return here.
106 Service Guide