Table 17: Site Preparation Checklist (continued)
DatePerformed ByFor More InformationItem or Task
“Rack Requirements for EX2200
Switches” on page 57
“Cabinet Requirements for EX2200
Switches” on page 58
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX2200 Switches” on page 60
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
“Requirements for Mounting an
EX2200 Switch on a Desktop or Wall”
on page 60
Verify that the wall meets the minimum
requirements for the installation of the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX2200 Switches” on page 60
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation
General Safety Guidelines and Warnings on page 155•
• General Site Guidelines on page 52
• Installing and Connecting an EX2200 Switch on page 71
• Mounting an EX2200 Switch on page 74
General Site Guidelines
This topic applies to hardware devices in the EX Series product family, which includes
switches and the XRE200 External Routing Engine.
This topic also applies to hardware devices in the QFX Series.