CHAPTER 6
Planning and Preparing the Site
•
Site Preparation Checklist for the SRX240 Services Gateway on page 29
•
General Site Guidelines for Installing the SRX240 Services Gateway on page 30
•
SRX240 Services Gateway Chassis on page 31
•
SRX240 Services Gateway Rack Requirements on page 33
•
Clearance Requirements for Airflow and Hardware Maintenance on the SRX240 Services
Gateway on page 33
Site Preparation Checklist for the SRX240 Services Gateway
The checklist in Table 14 on page 29 summarizes the tasks you need to perform when
preparing a site for installing the SRX240 Services Gateway.
Table 14: Site Preparation Checklist for Services Gateway Installation
Date
and
NotesAdditional InformationItem or Task
Environment
“SRX240 Services Gateway Chassis”
on page 31
Verify that environmental factors such as
temperature and humidity do not exceed
device tolerances.
Power
“SRX240 Services Gateway Electrical
and Power Requirements” on page 36
Measure distance between external power
sources and device installation site.
“SRX240 Services Gateway Grounding
Specifications” on page 59
Locate sites for connection of system
grounding.
“SRX240 Services Gateway AC Power
Specifications and Requirements” on
page 37
Gather the AC power requirements.
“SRX240 Services Gateway DC Power
Specifications and Requirements” on
page 38
Gather the DC power requirements.
29Copyright © 2015, Juniper Networks, Inc.