Table 14: Site Preparation Checklist for Services Gateway
Installation (continued)
Date
and
NotesAdditional InformationItem or Task
Rack Installation
“SRX240 Services Gateway Rack
Requirements” on page 33
•
Verify that your rack meets the minimum
requirements.
•
Plan the rack location, including required
space clearances.
•
Secure the rack to the floor and the
building structure.
Cables
“Interface Cable and Wire
Specifications for the SRX240 Services
Gateway” on page 41
•
Acquire cables and connectors.
•
Choose the cable length as required by
the distance between the hardware
components being connected.
•
Plan the cable routing and management.
Related
Documentation
SRX240 Services Gateway Chassis on page 31•
• SRX240 Services Gateway Site Electrical Wiring Guidelines on page 35
• SRX240 Services Gateway Rack Requirements on page 33
• Clearance Requirements for Airflow and Hardware Maintenance on the SRX240 Services
Gateway on page 33
• Interface Cable and Wire Specifications for the SRX240 Services Gateway on page 41
• General Site Guidelines for Installing the SRX240 Services Gateway on page 30
General Site Guidelines for Installing the SRX240 Services Gateway
The following precautions help you plan an acceptable operating environment for your
SRX240 Services Gateway and avoid environmentally caused equipment failures:
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow sufficient clearance between the front and back of the chassis and
adjacent equipment. Ensure that there is adequate circulation in the installation location.
•
Follow the ESD procedures to avoid damaging the equipment. Static discharge can
cause components to fail completely or intermittently over time.
•
Ensure that the blank Mini-PIM panel is installed in the empty slot to prevent any
interruption or reduction in the flow of air across internal components.
Copyright © 2015, Juniper Networks, Inc.30
SRX240 Services Gateway Hardware Guide