DeviceNet
10 Installation
10-1
L BA2175 EN 2.0
10 Installation
10.1 Components of the fieldbus module
1
6 5
3
2
4
7
Pos. Designation Meaning Notes
OFF 2175 fie ldbus module is not supplied with voltage; controller or external voltage supply is switched off.
1
Status of the
controller
GREE
BLINKING 2175 fieldbus module is supplied with voltage but is not connected to the controller (controller is
switched off, in initialization or not available).
connec
on
(two-colour LED)
N
Constantly
ON
2175 fie ldbus module is s upplied with voltage and is connected to the controller.
OFF • No connection with the master
• Fieldbus module is not supplied with voltage
Connection status
GREE
N
BLINKING Dup_Mac_ID testing. Still no connection to the master .
2
(two-colour LED)
GREE
N
ON DeviceNet connection built up.
RED
BLINKING No communication because time limit exceeded
RED
ON Internal fault of the fieldbus module
3
Green and red drive
LEDs (drive)
Operating status of the following controllers: 82XX, 8200 vector, 93XX and servo PLC 9300
(see Operating Instructions for the controller)
4
Fixing screw
5
5-pole plug-in connector (see chapter 10.3.2)
6
Connection
PE shield cable
Only for 820X and 821X:
If necessary use an additional PE shield cable which avoids EMC-related communication interference
in especially noisy environments.
7
DIP switch For settings see chapter 11
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.actechdrives.com - Email: info@actechdrives.com