EasyManuals Logo

Nordson ProBlue P10 User Manual

Nordson ProBlue P10
319 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #32 background imageLoading...
Page #32 background image
Installation
3-2
Part 1024496_06
2014 Nordson Corporation
Overview
ProBlue melters are factory‐configured for each order and require only the
assembly and set up tasks described in this section. If your melter was
ordered as a complete system, the shipping container will also contain one or
more hot melt hoses and guns. ProBlue 400/480 volt melters include a
transformer assembly that is shipped separately from the melter.
The melter is shipped from the factory with an installation kit that contains
components that must be assembled onto the melter by the customer. Some
additional materials must also be supplied by the customer to complete the
installation.
If optional equipment was ordered with the melter, refer to the documentation
provided with the optional equipment for installation and operating
instructions.
The illustrations accompanying the procedures in this section depict the P4
melter. Unless otherwise noted, the instructions also apply to the P7 and P10
melter.
Additional Information
This section presents installation procedures in their most commonly used
form. Procedural variations or special considerations are explained in the
additional information table that follows most procedures. Where applicable,
some table entries also contain cross‐reference information. Additional
information tables are indicated by the symbol shown to the left.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordson ProBlue P10 and is the answer not in the manual?

Nordson ProBlue P10 Specifications

General IconGeneral
BrandNordson
ModelProBlue P10
CategoryMelting Machines
LanguageEnglish

Related product manuals