5
9926814 R08 - 2015-2016 RZR 900 2016 RZR S 1000 Service
Manual
© Copyright Polaris Industries Inc.
5.31
DRIVEN CLUTCH ASSEMBLY
1. Install a new bearing
q
onto the clutch shaft using an
arbor press. Once bearing is fully seated, install a
new snap ring
w
.
2. Install the shaft and bearing assembly into the outer
sheave using an arbor press.
NOTE
Press only on the outer race of the bearing during
installation to prevent damaging the bearing.
3. Line up the X on the moveable sheave with the X on
the stationary sheave. Put the sheaves together.
4. Install the rollers
e
onto the roller pins
r
and install
on the clutch.
5. Install the roller pin into the sheave assembly on both
sides. The flat side of the roller pin faces towards the
sheaves.
PVT SYSTEM