Link-up and update
8.2 Link-up and update via PG command
CPU 410-5H Process Automation
122 System Manual, 09/2014, A5E31622160-AB
Link-up and update via PG command
Which commands you can use on the programming device to initiate a link-up and update
operation is determined by the current conditions on the master and standby CPU. The table
below shows which PG commands are available for link-up and update under which
conditions.
Table 8- 2 PG commands for link-up and update
Link-up and update
as PG command:
FW version in the
master and
standby CPUs
Available sync
connections
Hardware version
on master and
standby CPU
Number of
POs on system
expansion
cards
Restart of the
Are identical 2 Are identical Are identical
Switching to a
partner CPU with
modified configura-
Are identical 2 Are identical Are identical
Switching to a
partner CPU with
modified operating
Are different 2 Are identical Are identical
Switching to a
partner CPU with
modified hardware
Are identical 2 Are different Are identical
Switching to a
partner CPU with
Are identical 2 Are identical Are identical
Switching to a
partner CPU using
only one intact
Are identical 1 Are identical Are identical
Switching to a
partner CPU with
modified number of
POs on system
expansion card
Are identical 2 Are identical Are different