Contents
3
Cisco SCE 8000 10 GBE Installation and Configuration Guide
OL-29124-01
CHAPTER
4 Installing the Cisco SCE 8000 Chassis 4-1
Introduction 4-1
Preparing for Installation 4-3
Safety 4-3
Site Requirements 4-3
Preventing Electrostatic Discharge Damage 4-3
Environmental Requirements 4-4
Power Requirements 4-5
Power Connection Guidelines 4-5
AC-Powered Systems 4-5
DC-Powered Systems 4-12
Site Planning Checklist 4-14
Installing the Cisco SCE 8000 Chassis in the Rack 4-15
Unpacking the Cisco SCE 8000 Chassis 4-15
Installation Guidelines 4-16
Required Tools 4-16
Installing the Chassis Brackets 4-17
Installing the Chassis in the Rack 4-17
Installing an Optical Bypass Module 4-19
Connecting the System Ground 4-20
Required Tools and Equipment 4-20
Installing the Power Supplies in the Cisco SCE 8000 Chassis 4-22
CHAPTER
5 Connecting the Management Interfaces 5-1
Introduction 5-1
How to Set Up the Local Console 5-2
Initial Setup Parameters 5-3
Connecting the Management Interfaces 5-5
Cabling the Management Port 5-5
Verifying Management Interface Connectivity 5-6
CHAPTER
6 Cabling the Line Ports and Completing the Installation 6-1
Introduction 6-1
Connecting the Line Ports to the Network 6-2
Single Link: Inline Topology 6-2
Single Link: Receive-only Topology 6-2
Dual Link: Single Cisco SCE 8000 Topologies 6-3
Dual Link: Two Cisco SCE 8000s Topology 6-3