Center of anchor hole to concrete edge distance 79.4 mm.
Make sure to obtain data on compression strength of the concrete before using floor anchors.
3.3.3 Pan Type Floor Construction Requirement
For Pan type floor construction, steel channels must be designed by a local structural engineer to
span floor joists. See Illustration 3-4.
NOTE: For specific floor preparation procedures, refer to PIM Innova 2000/2100–IQ/
3100/4100 Cardiovascular Imaging System Pre–Installation Kit Installation
Procedures.
Illustration 3-4: Through–Bolt Supplied (Pan Type Floor Construction)
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
68 3 Structural Requirements

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Innova 4100 and is the answer not in the manual?

GE Innova 4100 Specifications

General IconGeneral
BrandGE
ModelInnova 4100
CategoryMedical Equipment
LanguageEnglish

Related product manuals