Illustration 3-10: Cable Curvature
NOTE: In case of on grade cabling, because of the minimum curvature constraint of 150 mm
(6”), the cable will have to come from the side between Innova LC Positioner and patient
table.
3.3.6 Seismic areas
Chiller: The seismic kit for Lytron is included with the chiller when shipped.
In Seismic areas all cabinets must be anchored to the floor. See Chapter 2, Section 3, Basic Innova
System Compatibility for referential documents. C1 & C2 Cabinets: Wall support 2285242.
Every sub–system is delivered on site with its proper seismic kit.
•
Monitor Flat Panel Seismic Kit: 2353317
•
VCIM seismic kit: 2365510.
Anti–seismic means be installed before opening the system for normal use.
Refer to Chapter 9, Section 2, Calculations for Seismic Anchoring Information.
3.4 Ceiling
Aluminum rails support the In–Room Monitor bridge used in Innova system X–ray rooms.
Reference:
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
74 3 Structural Requirements