Using Onboard Help
6-8 LOGIQ V2/LOGIQ V1 – User Guide
Direction 5610736-100
Rev. 9
Getting Started (continued)
Probe Connection
Figure 6-10. Probe Connection
Console Buttons
Figure 6-11. Console Buttons
Align the connector with the probe port
and carefully push into place with the
cable facing the front of the system. Next,
flip the connector locking lever up.
Area 1: Workflow keys
Area 2: Ultrasound operation keys
Area 3: TGC (Time gain compensation)
Area 4: User defined keys
Area 5: Primary menu
Area 6: Utility