1 Work lead
2 CNC connection cable (EtherCAT shown)
3 CAN cable
4 Power cable (120 VAC)
5 Coolant hose set (1 supply, 1 return)
6 Pilot arc lead
7 Negative lead (2/0 or 4/0)
8 Pilot arc, coolant hose set, shield water assembly
a Pilot arc lead
b Coolant hose set (1 supply, 1 return)
c Shield water hose (VWI or OptiMix)
9 Power, CAN, 5-gas assembly
d Power cable (120 VAC)
e CAN cable
f 5 gas hoses (VWI or OptiMix)
10 Torch lead
11 Hoses for supply gases/shield water
* Regulator
Position a gas regulator within 3 meters (10 feet)
of the gas connect console or take actions to
adjust inlet gas pressures to tolerances specified
in the process gas requirements.