Hose/Applicator Expansion Base
G-6
Part 1128350_02
E 2020 Nordson Corporation
RemovingtheMelterfromtheSub-Base (contd)
7. Push the melter backwards to disengage the locking tabs on the
sub-base, and lift the melter from the sub-base.
Figure on the left shows the melter being disengaged from the sub-base.
NOTE: Be careful not to damage the ground wire.
8. Lift the melter from the sub-base to remove.