Installation
3-9
Part 1128350_02
E 2020 Nordson Corporation
Unpack the Melter
Before starting the installation, remove the melter from the pallet, locate the
installation kit, and inspect the melter for damaged and missing parts. Report
any problems to your Nordson representative.
Contents of the Installation Kit
The installation kit (P/N 1127598) provided with the melter contains the
components shown in Figure 3-4. T he quantity and type of hose fittings
provided in the kit depends upon the melter's model number and
configuration.
The installation kit also contains a package of safety label overlays that are
printed in different languages. If required by local regulations, the appropriate
language overlay should be applied over the English version of the same
label. Refer to Safety Labels and Tags in Safety (Section 1) for the location of
each safety label on the melter.
P/N 1127671
P/N 1022993
P/N 1034145
P/N 105800
P/N 1127292
P/N 331872
P/N 173871
Figure 3-4 Ship-with kit contents
NOTE: 400/480 volt transformers are shipped with a separate installation kit.
Refer to ProBlue Flex 400/480 Volt Transformer (Appendix F) for installation
instructions, parts information, and wiring details.