Vertiv | SmartAisle2 | User Manual 100
Installation
2.13.5. Installation of NVR & the monitor hard disk
The NVR open cover, a hard disk installed monitor, a fixed cover NVR, and the NVR is installed in the same IT
racks where the RDU-M is placed. For an in-depth installation, refer to the NVR installation manual.
2.13.6. Install Access Controller
Access Controller is mounted on the same RDU-M IT racks of the tray and comprises an access card and a door
opening button. For more information, refer to the Access Controller user manual.
2.13.7. Control Panel Installation
Sl. No. Details of Equipment Sl. No. Details of Equipment
1 Base 7 Distribution Cabinet
2 Server Cabinet 8 Strong wire passage groove
3 Network Cabinet 9 Power cable trunking; copper and fiber cable tray
4 Access door 10 Cabinet top wire groove
5 Top Plate
11 Control panel
6 A/C Column