Vertiv | SmartAisle2 | User Manual 25
Installation
2.5. Cabinet Positioning
Sl. No. Details of Equipment
1 Base
2 Server Cabinet
3 Network Cabinet
4 Access door
5 Top Plate
6 A/C Column
7 Distribution Cabinet
8 Strong wire passage groove
9 Power cable trunking; copper and fiber cable tray
10 Cabinet top wire groove
11 Control panel
In this section, IT racks, air conditioning, power distribution, cabinet base, leveling, and cabinet fixing method will
be explained in detail.