1-12 Chapter 1: Preparing the Installation 42/24-10 EN Rev. 9
Guideline for Installation and Start-Up
Step Action see Page
Follow safety precautions xi, xii, xiii
Prepare the installation
Installation location 1-1
Sample gas inlet and outlet conditions 1-3
Test gases for calibration 1-5
Purge gas for housing purge 1-6
1
Power supply 1-7, 1-8
2 Unpack the gas analyzer 2-1
3 Install the gas connections ports 2-5
4 Check gas path seal integrity 2-5
5 Install the gas analyzer 2-6
Connect the gas lines
Analyzer module gas connections 3-1 to 3-9
6
Connect the gas lines 3-13
Connect the electrical leads
Connection diagrams 4-1 to 4-8
System bus 4-10
Signal, control and interface lines 4-13
7
Power supply lines 4-16, 4-18
Start-up the gas analyzer
Check the installation 5-1
Purge the gas paths and housing 5-2
Activate the power supply 5-3
8
Verify the calibration 5-5
9 Set the parameters Chapter 7
Basic Steps for
Installation and
Start-Up
10 Calibrate the gas analyzer Chapter 8