Figure 3-3 Failure of LU Switching
UPS
LPAR manager supports UPS by using Power management software which
running on the Guest OS. The Guest OS begins shut-down process when
receiving a request from UPS.
The LPAR manager begins shut-down operation after all of the Guest OSs
completed shut-down. And power status of Server Blade becomes off when
the LPAR manager has completed shut-down.
The Power management software has to be installed to the Guest OS for
controlling power of the Server Blade for LPAR manager. Control signal might
be delayed by network traffic when multiple Server Blades share one UPS.
Number of Guest OS managing from the UPS should be decided by
considering network traffic.
Table 3-4 UPS Supporting Functions
UPS Function
Power control supporting matrix on LP mode
LPAR (Guest OS)
Physical Server (LPAR
manager)
Cool down after power down
Y
1
Y
2
Scheduled power cut
Y
1
Y
2
High Reliability Functions
3-9
Hitachi Compute Blade 500 Series Logical partitioning manager User's Guide

Table of Contents

Other manuals for Hitachi CB 520H B2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi CB 520H B2 and is the answer not in the manual?

Hitachi CB 520H B2 Specifications

General IconGeneral
BrandHitachi
ModelCB 520H B2
CategoryServer
LanguageEnglish

Related product manuals