LPAR manager Firmware Upgrade / Update
See the Hitachi Compute Blade 500 series Management Module Setup Guide
for obtaining LPAR manager firmware and Version Upgrade / Revision Update
procedure.
Relation between server blade and LPAR manager firmware
Show the relation between server blade and LPAR manager firmware below.
• LPAR manager firmware can be installed up to 4 banks in the
management module.
• It is necessary for each server blade to assign LPAR manager firmware
bank in the management module.
• A LPAR manager firmware bank can be assigned to the multiple server
blades.
• The LPAR manager firmware of assigned version operates in the server
blade.
• Each server blade has the "Upper bound of version" which can be
updated.
• LPAR manager firmware within the "Upper bound of version" on the
server blade can be assigned.
• LPAR manager firmware version of the server blade which is running
cannot change.
• Management module firmware versions lower than A0135: LPAR manager
firmware can be installed to the LPAR manager firmware bank which is
not assigned to a server blade. Management module firmware versions
later than A0145: LPAR manager firmware can be installed to the LPAR
manager firmware bank which is not assigned to a server blade, or all
LPAR manager firmware banks.
Maintenance Functions
4-13
Hitachi Compute Blade 500 Series Logical partitioning manager User's Guide

Table of Contents

Other manuals for Hitachi CB 520H B2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi CB 520H B2 and is the answer not in the manual?

Hitachi CB 520H B2 Specifications

General IconGeneral
BrandHitachi
ModelCB 520H B2
CategoryServer
LanguageEnglish

Related product manuals