Installing the new server blade
1. Install the new firmware.
2. Assign the new firmware.
Installing the new firmware (When an unused bank does not exist)
Changing operational version
1. Select the firmware bank which is rewriting.
2. Shut down LPAR manager.
3. Remove the assignment.
4. Install the new firmware.
5. Assign the new firmware.
Installing the new server blade
1. Select the firmware bank which is rewriting.
2. Shut down LPAR manager.
3. Remove the assignment.
4. Install the new firmware.
5. Assign the new firmware.
LPAR Migration
The LPAR migration functionality migrates an LPAR from the server blade on
which it is currently running to another server blade.
For details about system requirements and notes, see the Hitachi Compute
Blade LPAR Migration Guide.
For details about how to perform LPAR migration, see the Hitachi Command
Suite Compute Systems Manager User Guide or the Hitachi Compute Blade
HVM Navigator User's Guide - Migration.
4-16
Maintenance Functions
Hitachi Compute Blade 500 Series Logical partitioning manager User's Guide

Table of Contents

Other manuals for Hitachi CB 520H B2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi CB 520H B2 and is the answer not in the manual?

Hitachi CB 520H B2 Specifications

General IconGeneral
BrandHitachi
ModelCB 520H B2
CategoryServer
LanguageEnglish

Related product manuals