EasyManuals Logo
Home>Huawei>Accessories>DBS3900

Huawei DBS3900 User Manual

Huawei DBS3900
556 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #414 background imageLoading...
Page #414 background image
No. Item
11 The extra length of the indoor cable ties is cut, and the cut surfaces are smooth
without sharp edges. The extra length of 3 mm to 5 mm of the outdoor cable
ties is reserved when the cable ties are cut.
12 The unused ports are properly protected.
11.6 Power-On Check
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
CAUTION
The DBS3900 must be powered on within seven days after it is unpacked, and the period for
which the DBS3900 remains powered-off during maintenance must not exceed 48 hours.
Power-On Check in the AC Power Supply Scenario
Figure 11-31 shows the power-on check when a DBS3900 is deployed in the DC power supply
scenario.
DBS3900 (Ver.B)
Installation Guide
11 Indoor Scenario with DC Power Supply (BBU Installed
on a Wall)
Issue 06 (2011-09-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
401

Table of Contents

Other manuals for Huawei DBS3900

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei DBS3900 and is the answer not in the manual?

Huawei DBS3900 Specifications

General IconGeneral
BrandHuawei
ModelDBS3900
CategoryAccessories
LanguageEnglish

Related product manuals