EasyManua.ls Logo

Huawei DBS3900 - Installation Process

Huawei DBS3900
556 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14.1 Installation Process
When a DBS3900 is deployed indoors with DC power supply, the BBU is installed indoors, and
RRUs obtain outdoor power supply, you must install a cabinet, components in it, and related
cables.
Figure 14-1 shows the installation process.
Figure 14-1 Installation process
DBS3900 (Ver.B)
Installation Guide
14 Indoor Scenario with DC Power Supply (BBU Installed
Indoors and RRU Powered Outdoors)
Issue 06 (2011-09-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
502

Table of Contents

Other manuals for Huawei DBS3900

Related product manuals