1. P lac e i mpl ement on th e lev el
ground.
2. Drive the tractor backward to move
as close as possible to an imple-
ment (Approx. 5 cm). Then, adjust
the height of the lower link to be par-
allel to the pins of the implement.
3. Place the shift levers in the neutral
position, stop the engine and apply
the parking brake.
(1) Implement Support (2) Implement Pin (1) Check Link (2) Turn Buckle
4. Lengthen the chain by turning the
check link turn buckle.
5. First install the left lower link to the
implement pin and insert lynch pin
into the hole and turn the ring to
hold implement pin securely.
6. Install the right lower link to the
implement pin and insert lynch pin
into the hole and turn the ring to
hold implement pin securely.
(1) Turn Buckle (2) Lift Rod (RH)
(3) Lower Link (4) Implement Pin
(5) Lynch Pin
H61O608b
H61O601A H61O615A
REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT
(INCLUDING CONNECTION OF UNIVERSAL JOINT)