Defibrillator/Monitor Operator’s Manual D - 1
D Defibrillator Shift Checklist
Equipment Name: Serial Number: Department:
Item Pass/
Fail
Corrective Actions/Remarks
1. Equipment Appearance
â—† Clean, no foreign substance, no crack
2. Cables/Connectors
â—† Cables not frayed, connectors and pins not broken or
loose
â—† Connectors engage securely
3. Batteries
â—† Battery installed with at least 60% of battery capacity
â—† Fully charged spare battery available
4. Necessary Accessories (Electrode pads, electrodes,
paddles or recorder paper)
â—† Present and sufficient
â—† Inspected to be used normally
5. Auto Test
â—† Status indicator off
6. Shock Test
â– If the external paddles are used:
a. Connect the equipment with AC power supply, and
the AC power indicator is illuminated.
b. Connect the paddles cable to the equipment, and
place the external paddles in the paddle tray.
c. Press the Charge button on the external paddles, and
charge the equipment to 50J.
d. Press the Shock button on the external paddles.
e. The system prompts that the shock is delivered
normally.
6. Shock Test
â– If the electrode pads are used:
a. Connect the equipment with AC power supply, and
the AC power indicator is illuminated.
b. Connect the pads cable to the equipment.
c. Perform the Energy Delivery test item of the user test
with the test load connected.
d. The system prompts that the Energy Delivery test is
passed.
7. Monthly Check on Expiration Date
â—† The electrode pads are not expired.
Checked by:
Date: