Building Technologies Basic Documentation LMV27... CC1P7541en
1 Safety notes 17.12.2018
1.6 Electrical connection of flame detectors
It is important to achieve practically disturbance- and loss-free signal transmission:
Never run the detector cables together with other cables
– Line capacitance reduces the magnitude of the flame signal
– Use a separate cable
Observe the permissible detector cable lengths
The mains-powered ionization probe is not protected against electric shock hazard.
It must be protected against accidental contact
Earth the burner in compliance with the relevant regulations; earthing the boiler
alone does not suffice
Locate the ignition electrode and the ionization probe such that the ignition spark
cannot arc over to the ionization probe (risk of electrical overloads)
Insulation resistance
- Must be a minimum of 50 M between ionization probe and ground
- Soiled detector holders reduce the insulation resistance, thus supporting
creepage currents

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens LMV27.100x2 and is the answer not in the manual?

Siemens LMV27.100x2 Specifications

General IconGeneral
BrandSiemens
ModelLMV27.100x2
CategoryController
LanguageEnglish

Related product manuals