e-STUDIO555/655/755/855 © 2009 - 2011 TOSHIBA TEC CORPORATION All rights reserved
OUTLINE OF THE MACHINE
2 - 46
2.6 Removal and Installation of Options
[A] Finisher
[B] Large Capacity Feeder (LCF)
(1) Press the [ON/OFF] button on the control
panel to shut down the equipment.
(2) Turn the power OFF using the main power
switch on the right-hand surface of the
equipment.
(3) Unplug the power cable.
(4) Take off the connector cover and unplug the
interface cable.
Fig. 2-44
(5) Remove 1 screw and take off the finisher
from the slide rail.
Note:
When moving the finisher unit by itself, be
careful that it does not topple over.
Fig. 2-45
(1) Press the [ON/OFF] button on the control
panel to shut down the equipment.
(2) Turn the power OFF using the main power
switch on the right-hand surface of the
equipment.
(3) Unplug the power cable.
(4) Press the button to separate the Large
Capacity Feeder (LCF) from the equipment.
Fig. 2-46
Connector cover
Interface cable
Slide rail