Quick installation and commissioning flowchart
SeeTask
Type designation key (page 37)
Identify the frame size: R0, R1, R2, etc.
Guidelines for planning the electrical
installation (page 49)
Plan the installation.
Check the ambient conditions, ratings and required cooling
air flow.
Technical data (page 127)
Unpacking the delivery (page 45)
Unpack and check the delivery.
Grounding system compatibility check
– IEC (page 67)
If the supply network is not a symmetrically grounded TN-
S system, make sure that the drive is compatible with the
grounding system.
Grounding system compatibility check
– North America (page 91)
Installing the drive (page 45)
Install the drive.
Routing the cables (page 57)
Route the cables.
Measuring the insulation resist-
ance (page 66)
Measure the insulation of the input cable, motor and motor
cable.
Connecting the power cables – IEC
(shielded cables) (page 72)
Connect the power cables.
Connecting the power cables – North
America (wiring in conduits) (page 96)
Connecting the control
cables (page 74)
Connect the control cables.
Installation checklist (page 115)
Examine the installation.
Refer to ACS380 Quick installation and
start-up guide (3AXD50000018553
[English]) and ACS380 Firmware
manual (3AXD50000029275 [English]).
Commission the drive.
24 Introduction to the manual