EasyManuals Logo

BMW R 850/1100 R User Manual

BMW R 850/1100 R
464 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #265 background imageLoading...
Page #265 background image
32.11
Removing and installing wire cable
distributor block
[RS/RT] Remove side fairings.
Unscrew fuel tank and pull to the rear.
Remove cold-start lever (increased idle speed)/
disconnect the wire cable.
Remove the cable cover at the throttle operating
fitting.
Detach the wire cables at the left and right
throttle stub pipes.
Relesse the cable straps.
Detach the engine breather pipe (1) from the en-
gine.
Pull the wire cable distributor block (2) out of
holder (3) in the direction of the arrow.
Install in the reverse order of work.
Adjust the wire cables.
a See Group 00
1
3
2
RT320120

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BMW R 850/1100 R and is the answer not in the manual?

BMW R 850/1100 R Specifications

General IconGeneral
BrandBMW
ModelR 850/1100 R
CategoryMotorcycle
LanguageEnglish

Related product manuals