Engine Disassembly
- 52 -
3. Disassembly and Reassembly of Major Components
3.1. Engine Disassembly
z
Engine part’s disassembly procedures are as follows;
z
For the various tool storage before disassembly and parts storage after disassembly, the shelf for
parts is prepared.
z
At the time of disassembly and reassembly, do the work with the naked and clean hand, and also the
working place must be maintained clean.
z
The torn parts after disassembly must be kept not to collide each other.
z
In disassembling, torn parts should be laid in disassembled order.
3.1.1. Oil level gauge
z
Take out the oil level gauge
3.1.2. Engine oil
z
Remove an oil drain cock from the oil pan, and let engine oil discharge into the prepared vessel.
3.1.3. Cooling water
z
Remove the cooling water drain plug from the cylinder block and oil cooler, various pipes, etc. and let
the cooling water discharge into the prepared vessel.
3.1.4. Cooling fan
z
Remove fan fixing bolts, then take off the
cooling fan.
3.1.5. V-belt
z
Loosen the V-belt tension adjusting
bolts, and remove the V-belt.