110 Instructions for use | Atlan A100 (XL), A300 (XL), A350 (XL) SW 2.1n
Tests
10.Close the flow control valve (2).
7 Tests
7.1 Safety instructions
Checklist
The checklist contains manual test steps that must be performed by the user at the
beginning of the system test or leakage test. These test steps represent essential
manual safety checks. These safety tests are necessary to obtain a valid test result
and to ensure proper device operation.
► Carefully follow the instructions of the checklist.
7.2 Status of the device functions
● In standby mode, touch the Details... or Tests... button.
The Test results list (1) shows the results of the test last performed. The following
information is displayed using different colors:
– Influence of the individual device functions on the functional integrity of the
device
– Leakage values
35069
Color Meaning
Green Successfully tested, fully available
Yellow A non-critical fault has been detected or the last test result is older
than 72 hours. The device can be operated with restricted function.
Red A serious fault has been detected or the last test result is older than
28 days. Operation is not possible.
Gray Not tested
Test results Available tests