Chapter 2. Instrument Setup
54 USM Go Operator’s Manual
2.6 Calibrating the Instrument
To calibrate the USM Go, follow the instructions in this section.
2.6.1 Pre-Calibration Check List
To improve the accuracy and quality of your calibration, be sure that the following steps have been taken before beginning the calibration:
• Install the probe
• Adjust the DUAL (RECEIVER) setting to match probe
• Set the material type
• Set the DISPLAY DELAY to 0 (recommended)
• Set the PRF to AUTO LOW
• Set TCG to OFF
• Set REJECT to 0 (recommended).