GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
8-40 Section 8-16 - Replacement of Power ON/OFF key PCB Assembly
Section 8-16
Replacement of Power ON/OFF key PCB Assembly
8-16-1 Manpower
One person, 30 minutes
8-16-2 Tools
Philips screw driver
8-16-3 Disassembly procedure
1.) Unscrew 9 screws at the bottom of the keyboard body. Refer to the figures below.
Figure 8-46 Unscrewing 9 screws