GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
8-168 Section 8-54 - Functional Checks after FRU replacement (Debrief Guidelines)
Section 8-54
Functional Checks after FRU replacement (Debrief Guidelines)
1.) Perform required Functional and/or Leakage Current tests based upon the FRU being replaced.
2.) Clarify the scripts to debrief a Service Dispatch using your pole's dispatch tool.
Use this script in the Service Comments when debriefing a Service Dispatch.
For a replaced FRU, use the following debrief script:
Proprietary Service Manual, DIRECTION 5775469,Revision 3 , Section [ Section 10-6 "System
Maintenance" on page 10-8]. Equipment passed all required tests and is ready for use.
And, if testing leaking current, use the following text.
Proprietary Service Manual, Voluson™ P8/Voluson™P6, Revision Voluson™ P8/Voluson™P6,
Section [ Section 10-8 "Electrical Safety Tests" on page 10-14]. Leakage Current meets allowable
limits. Equipment passed all required tests and is ready for us.