GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
8-100 Section 8-30 - Replacement of the Probe Holder(KIT)
Section 8-30
Replacement of the Probe Holder(KIT)
8-30-1 Manpower
One person, 1 minutes
8-30-2 Tools
None
8-30-3 Removal Procedure
1.) Remove 5 probe holders. Refer to the figure below.
8-30-4 Installation Procedure
1.) Install the new parts in the reverse order of removal.
Figure 8-147 Removing the 5 PROBE HOLDERs