Model 6517B Electrometer Reference Manual Section 14: SCPI command reference
6517B-901-01 Rev. C / August 2015 14-171
:SPOints <NRf>
This command specifies the number of measurement points for the specified test.
Usage
:TSEQuence:CLEakage:SPOints <NRf>
:TSEQuence:CIResistance:SPOints <NRf>
:SPOints?
<NRf>
1 to Max Buffer Size - Number of points in test sequence
Details
This command specifies the number of measurement points for the following tests:
ï‚· Capacitor leakage test
ï‚· Cable insulation resistance test
:TSEQuence:CLEakage:SPOints specifies the leakage test points.
:TSEQuence:CIResistance:SPOints specifies the resistance test points.
:SPOints? queries the number of points
Also see
None
:SPINterval <NRf>
This command specifies the time interval between measurement points for the specified test.
Usage
:TSEQuence:CLEakage:SPINterval <NRf>
:TSEQuence:CIResistance:SPINterval <NRf>
:SPINterval?
<NRf>
0 s to 99999.9 s Interval between measurement points
Details
This command specifies the time interval between measurement points for the following tests:
ï‚· Capacitor leakage test
ï‚· Cable insulation resistance test
:TSEQuence:CLEakage:SPINterval specifies the leakage test interval.
:TSEQuence:CIResistance:SPINterval specifies the resistance test interval.
:SPINterval? queries the interval
Also see
None