Figure 129: System configuration for the probesubsites project
KCon setup
Refer to Use KCon to add a switch matrix to the system (on page 2-23).
Test flow
When you run the probesubsites project, the following occurs:
1. The action prober-init initializes the prober driver.
2. The test moves to subsite1, 4terminal-n-fet.
3. The action prober-contact moves the chuck to the wafer.
4. The action connect connects the SMUs to the probes for the n-channel MOSFET as shown in
the following figure.