Electrical installation 69
Connecting the grid cables – units with 200 mm wide
incoming cubicle
Note: The cabling from all converter modules must be physically identical considering
cable type, cross-sectional area and length.
Connection diagram
The diagram below shows the connection of the grid cable to the converter. The
connection principle is the same also for the larger units.
Note: See chapter Technical data for:
number and sizes of the cable lead-throughs
number and sizes of the connection busbars
tightening torques for the power connections.
Note: For the instructions on the possible construction and sizes of the grid-side cabling
and PE conductor, see chapter Planning the electrical installation.
PE
~
=
L1
L2
L3
K1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB ACS800-67LC and is the answer not in the manual?

ABB ACS800-67LC Specifications

General IconGeneral
BrandABB
ModelACS800-67LC
CategoryMedia Converter
LanguageEnglish

Related product manuals