XSCF>
poweron
-y
-p
0
XSCF>
showpparstatus
-p
0
PPAR-ID
PPAR
Status
00

Running
XSCF>
showboards
-p
0
PSB

PPAR-ID(LSB)
Assignment

Pwr

Conn
Conf
Test

Fault
----
------------
-----------
----
----
----
-------
--------
00-0
00(00)

Assigned

y

y

y

Passed

Normal
01-0
00(01)

Assigned

y

y

y

Passed

Normal
02-0
00(02)

Assigned

y

y

y

Passed

Normal
Note
-
Suppose
you
install
the
SPARC
M10-4S
together
with
a
PCI
expansion
unit
connected
to
it
and
set
the
enabling/disabling
setting
of
the
direct
I/O
function
of
the
PCI
expansion
unit.
Then,
at
the
next
startup,
the
logical
domain
configuration
of
the
physical
partition
resets
to
the
factory-default
state.
See
"1.7.2
Notes
on
using
the
direct
I/O
function"
and
"1.7.3
How
to
save/restore
the
logical
domain
configuration
information
and
the
OpenBoot
PROM
environment
variable"
in
the
PCI
Expansion
Unit
for
Fujitsu
M10/SPARC
M10
Systems
Service
Manual
and
take
action.
14.
Execute
the
showpp arstatus
command
to
check
the
operation
statu s
of
the
physical
partition.
In
the
following
example,
the
[PPAR
Status]
field
displays
"Running,"
so
the
physical
partition
is
operating
correctly.
15.
Execute
the
showbo ards
command
to
check
the
system
board
(PSB)
statu s .
In
the
following
example,
since
both
the
[Conn]
and
[Conf]
fields
display
"y"
for
system
board
02-0,
the
system
board
(PSB)
has
been
added
correctly.
16.
Reconfigure
the
logical
domains.
Assign
the
resources
of
the
installed
SPARC
M10-4S
to
an
existing
logical
domain
or
a
newly
configured
logical
domain.
For
details,
see
the
Fujitsu
M10/SPARC
M10
Systems
Domain
Configuration
Guide.
After
the
reconfiguration,
execute
the
ldm
add-spconfig
command
to
save
the
logical
domain
configuration
in
the
XSCF.
9.2.3 Installing
the
server
after
turning
off
the
input
power
to
the
entire
system
This
section
describes
the
procedure
for
installing
the
SPARC
M10-4S
after
stopping
the
entire
system
while
work
is
in
progress
and
turning
off
the
input
power.
 
For
details
on
the
XSCF
commands
executed
in
each
step,
see
the
Fujitsu
M10/SPARC
M10
Systems
XSCF
Reference
Manual.
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
July
2015260

Table of Contents

Other manuals for Fujitsu M10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu M10 and is the answer not in the manual?

Fujitsu M10 Specifications

General IconGeneral
BrandFujitsu
ModelM10
CategoryServer
LanguageEnglish

Related product manuals