4 Installation
This chapter describes:
• Installing the CPU
• Installing the power supply
• Installing additional modules
• Activating or replacing the backup battery
• Serial port connections
• Installing expansion modules
• Ethernet connection for CPUE05
• CE Mark installation requirements
System installation instructions, which give guidelines for carrier, power supply, and
module installation, as well as information about field wiring and grounding, are located
in the VersaMax Modules, Power Supplies, and Carriers Manual (GFK-1504).
Installation GFK-1503E User Manual 51
For public disclosure