2. To install the hard drive, push in the drive and then close the locking lever.
Installing a hot-swappable power supply
The server has two hot-swappable power supplies. This power supplies are located at the rear of
the server.
CAUTION: Observe all ESD safety precautions before attempting this procedure. Failure to follow
ESD safety precautions might result in damage to the server.
NOTE: The power supply is a hot-swappable device. You do not have to interact with the operating
system to add a power supply to the server.
Figure 7 Power supply loading guidelines
21
Power supply bay 1Power supply bay 2
1. Remove the power supply blank.
42 Optional components