Site Preparaon Checklist for EX4100 and EX4100-
F Switches
The checklist in Table 27 on page 85 summarizes the tasks you need to perform when preparing a site
for EX4100 and EX4100-F switch installaon.
Table 27: Site Preparaon Checklist
Item or Task For More Informaon Performed By Date
Environment
Verify that environmental factors
such as temperature and humidity
are within switch tolerances.
"Environmental Requirements and
Specicaons for EX4100 and
EX4100-F Switches" on page 88
Power
Measure the distance between
external power sources and the
switch installaon site.
"Clearance Requirements for
Airow and Hardware Maintenance
for EX4100 and EX4100-F
Switches" on page 93
Locate sites to connect system
grounding.
Calculate the power consumpon
requirements.
• "AC Power Supply in EX4100
and EX4100-F Switches" on
page 68
• "DC Power Supply in EX4100
Switches" on page 78
Hardware Conguraon
Choose the number and types of
switches you want to install.
"EX4100 and EX4100-F Switches
Hardware Overview" on page 2
85