FORWARD PITCH
Keep the pitch button pushed in and operate the right tilt.
Applicable operation
•
Digging natural ground and bed-rock (digging hard soil)
• Pushing soil over cliffs
• Pushing-up soil (Reduces spillage of soil over the top sur-
face of the blade, and reduces amount of soil carried back)
DOZING WORK
PUSHING DOWN OPERATION ON FLAT GROUND
NATURAL GROUND AND ROCKY TERRAIN
WARNING
For safety, if dumping seems dangerous, perform the double doze-off a cliff.
1.
Perform digging by forward pitch (1). When the load becomes approximately 80 % of
the blade, return the
blade to the straight pitch (2) and continue digging (A).
2.
Carry the load (B) by rearward pitch (3) since the larger quantity of soil can be carried at a time.
Adjust the blade edge to become the best angle that the soil is pushed forward.
3.
Perform dumping (C) by forward pitch (3).
EMBANKMENT AND SOFT SOIL CONDITION
Perform digging by rearward pitch or straight pitch, and carry the soil by rearward pitch.
METHOD FOR USING DUAL TILT DOZER EFFECTIVELY ATTACHMENTS AND OPTIONS
6-14