EasyManuals Logo
Home>MTS Systems>Controller>FlexTest IIm

MTS Systems FlexTest IIm User Manual

Default Icon
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #54 background imageLoading...
Page #54 background image
Installing the 493.02 Chassis (FlexTest SE)
MTS 793 Controller Hardware Installation
53
The AC power ground is through the power cord. The power cord
must be plugged into both the chassis and the power source for proper
grounding.
Proper grounding is required for safe operation.
It is also required to meet EMC emission and susceptibility requirements.
Power All equipment related to the chassis should be connected on the same
fused power circuit.
The power supply can accept single-phase voltages within 90–264
V AC at frequencies between
47–63 Hz.
The maximum continuous power usage is approximately 300 W.
The current draw depends on the local voltage supply. A 15 amp
line will be adequate for the chassis and the computer.
System ground cable
(PN 005-402-3xx) connected to
the test frame or other
components.
Rack Mount Configuration
Signal common cable
(PN 037-766-101) connected to
the power panel.
Chassis ground cable
(PN 037-766-102) connected to
the vertical conductive rail.
CAUTION
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTS Systems FlexTest IIm and is the answer not in the manual?

MTS Systems FlexTest IIm Specifications

General IconGeneral
BrandMTS Systems
ModelFlexTest IIm
CategoryController
LanguageEnglish

Related product manuals