EasyManuals Logo
Home>Wacker Neuson>Excavators>ET24

Wacker Neuson ET24 User Manual

Wacker Neuson ET24
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #206 background imageLoading...
Page #206 background image
7-44 OM ET18/20/24 us 1.3 * et18_20_24w710.fm
7
Checking the condition and age of hydraulic hoses
Notice
Leaks and damaged pressure lines must be immediately
repaired or replaced by a Wacker Neuson service center. This
not only increases the operating safety of the machine but also
helps to protect the environment.
Leaks and damaged pressure lines must be immediately
repaired or replaced by a Wacker Neuson service center.
Have hydraulic hoses replaced every 6 years from the date of
manufacture, even if they do not seem to be damaged.
In this respect, we recommend that you observe all the relevant safety
regulations for hydraulic lines, as well as the safety regulations regarding
accident prevention and occupational health and safety in your country.
Also observe DIN 20 066, part 5.
The article number is marked on the clamping section, and the date of
manufacture is indicated on the hose of each hose connection.
Have a line replaced if one of the following problems is detected:
Damaged or leaky hydraulic seals.
Worn or torn shells or uncovered reinforcement branches.
Expanded shells in several positions.
Entangled or crushed movable parts.
Foreign bodies jammed or stuck in protective layers.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson ET24 and is the answer not in the manual?

Wacker Neuson ET24 Specifications

General IconGeneral
BrandWacker Neuson
ModelET24
CategoryExcavators
LanguageEnglish

Related product manuals