EasyManuals Logo
Home>Barco>Projector>DP2K-12C

Barco DP2K-12C Service Manual

Barco DP2K-12C
359 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #308 background imageLoading...
Page #308 background image
19. Start Pulse Generator
19.1 Introduction
Functionality
The purpose of the Start Pulse Generator (SPG) is to ignite the lamp with a burst of high voltage peaks. The SPG super imposes
high voltage pe aks onto the normal dc start-up voltage of the lamp supplied by the Lam p Power Supply. Once the lamp is s tarted up
and illuminating, the high voltage is removed and the lamp v oltage drops to the arc voltage. The high voltage peaks are added to the
lamp voltage by a su perimposing transformer whic h is in series with the positive connection from the LPS to the lamp. The negative
connection from L PS to lam p is direct and is connected to the c hassis at the lamp side. The full lamp c urrent passes through the
secondary of the superimposing transformer.
Parts
B
A
D
E
C
Image 19-1
A Black marked cable lug. Has to be connected with the negative “LAMP OUT” pin of the LPS module.
B Red marked cable lug. Has to be connected with the positive “LAMP OUT” pin of the LPS module.
C Ferrite block.
D Negative connection pin from SPG to lamp house.
E Positive connection pin from SPG to lamp house.
304 R5905043 DP2K-12C/11CX 19/02/2018

Table of Contents

Other manuals for Barco DP2K-12C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Barco DP2K-12C and is the answer not in the manual?

Barco DP2K-12C Specifications

General IconGeneral
BrandBarco
ModelDP2K-12C
CategoryProjector
LanguageEnglish

Related product manuals