GE Power Management 469 Motor Management Relay 7-1
7 TESTING 7.1 OVERVIEW
7
7 TESTING 7.1 OVERVIEW 7.1.1 TEST SETUP
The purpose of this testing description is to demonstrate the procedures necessary to perform a complete
functional test of all the 469 hardware while also testing firmware/hardware interaction in the process. Since
the 469 is packaged in a drawout case, a demo case (metal carry case in which an 469 may be mounted) may
be useful for creating a portable test set. Testing of the relay during commissioning using a primary injection
test set will ensure that CTs and wiring are correct and complete.
Figure 7–1: SECONDARY INJECTION TEST SETUP

Table of Contents

Other manuals for GE 469

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE 469 and is the answer not in the manual?

GE 469 Specifications

General IconGeneral
BrandGE
Model469
CategoryRelays
LanguageEnglish

Related product manuals