Rev. 2.0
Maintenance Guide
5-24
5-12. Replacing the Pressure Reducing Valve
Disconnect the piping tube and remove the mounting screw (SL6041092TN) d and replace the
pressure reducing valve c with a new one.
Pressure must be adjusted as follow.
Y pusher: 0.50 MPa ( ± 0.05 MPa)
∗ Before starting the production, change and/or adjust the pusher pressure according to the
PWB thickness.
Figure 5-12
図 5−12